08/03/2011 sockets and switches
Today, the company was S. again on the spot and has made all the switches and outlets and the bell. And already it looks already quite different :-)
We are now looking forward advance of when the plasterers. Still on the floor is dry, and we have not really warm. Our supervisor told us yesterday by telephone that we should turn up the radiator. This we have done and are curious. Because water on windows or high humidity, as with other building diaries already read, is with us still not occurred.
Also tomorrow we are calling our kitchen manufacturer that the kitchen can be measured. After telephone consultation with finger still come home to approximately 13 mm for tiles and glue in height.
Site Journal In Wartenberg With "building My House"
Tuesday, March 8, 2011
Monday, March 7, 2011
Rom Soul Silver Anglais Antifreeze
03/07/2011
has now got our garage the missing window. We were called this morning if today could be anyone on site. This has fortunately worked.
We have today laid power cables and socket in the garage, installed a light switch and a lamp.
Thus, the issue has garage now hopefully coming to an end.