At this time there was only the idea of "we want to build in the district of Erding.
course, we had an idea of how big our house should be built and in what style we wanted. But there were at this time either for land or architectural plans but only "Stricherlzeichnungen" on graph paper, as you know the from his school days.
By completing our construction contract with "construction my house in December 2008, we had assured, however, the fixed price and therefore the cost of our house for 12 months This at least was one. "unknown" is now known -. the house price, the balance of our budget was now easily possible to the scope for .. to identify land and building costs so we were able to completely relax and go on having our financial resources on site selection
In August 2009 the time had come - we were together with the property sellers on our dream property simply on the outskirts. Located directly on the construction line, after 3 pages to about 3 km in Unkreis Guaranteed Pot plane and 560 square meters, with option to buy additional 500 square meters directly adjacent.
Since we are due to the fixed price for our house to the penny could calculate exactly what we could taste the plot, was a reconciliation with the expectations of the seller from the neighborhood is no "act of state" but a matter of minutes. On 9/15/2009 we purchased our property by notarial contract.
Meanwhile, our "Stricherlzeichnung" of floor plans basement, ground floor and first floor of the architect Uwe Liebers of green bei Erding been converted into buildable drawings, so that before the land purchase could also assess accurately whether the "dream land" for Built according to our ideas would be suitable.
After our land outside the town of Wartenberg, the district is Thenn, there was only one for building code and no development plan. We were largely free in our house design. Only a few municipal councils were of the opinion that they would have us press on to their own taste in the roof design, but had probably not expected my tenacity and ability. Then in the end the District Office in Erding has meant a minimum floor area exceeding the value of 0.30 to 0.32 "is not approvable."
But this Deputy Head of the Building Department the district administration office had "bad cards" because I was able to demonstrate that this excess exactly one year before the district Pesenlern certainly is "approvable" was. The
then by me on 03.01.2010 requested justification for the overrun was 4 hours later in Erding district office and my building permit on 01/08/2010 on my desk.
It works! Why not now?
My wife and I were on 13 and 14.04.2010 in the work of "building my house in the woods for free samples and have thus given the go-ahead for production of our house.
was on 05/14/2010 dug through the basement excavation and the farmer to the full Townhouses 05/25/2010 completed, so that at 5/31/2010 - as planned - delivered our house can be built and expanded.
Until the end of June 2010 will be our solar system with 8.21 kWp in operation and thus produce much more energy in the future, when this house and we will ever need. We are thus in the next 20 years, no electricity costs have more to sell but on the contrary to the public electricity grid. From the state-guaranteed income, we will have paid for our solar system and the heat pump in about 12 years. In combination with a Rotex heat pump, which delivers heat energy in the top 9.5 kWp, our house will be heated not only ecologically sound, it is also hot Water for bathroom and kitchen produce.
Return on capital employed for this purpose is around 11% - you know at the time an asset that generates more in interest? I do not.
And the best part - we are now completely independent in terms of energy for our house. Whether the Russians once again turn on the gas, set the gas prices high due to crisis or whether shoots or because of shortage of quantity of fuel oil price through the roof, we can at least be indifferent with respect to our house - we are "self" has become.
you want to know more about it or build it to be?
happy.
Call me simple. I would advise you to all questions relating to building construction and energy efficiency.